TUSP

Call: 01233 640257
  • Careers
Home / Careers / Senior Authorised Person – 33/11kv Distribution

Senior Authorised Person – 33/11kv Distribution

Contract
Location Poole, Dorset
Day Rate £ 350 + Mileage Allowance
Date Posted 12th Jun 2017
Our Ref TUSP/SAP/1206

Introduction
Our client is a major UK Contracting Group. They currently have an immediate opportunity for an experienced Senior Authorised Person to work on a multi – million pound framework programme throughout the South and South West regions.
 
Project Overview
Design and Refurbishment of multiple 132kv OHL Routes, Designation PZA, PZB, FW, AD and MC
 
Role Definition
•The role incorporates the application to de-energize the parts of the Distribution Network taking into consideration back feeds from the MV and LV system, induced voltage and security of the system whilst locks and Points of Isolation have been engaged. The SAP will issue a safety document to operatives identifying controls and protection to be in place, proving the line dead before work commences. Once work has been completed the SAP is required to ensure re-energisation can be completed, and all changes to the OHL recorded, and submitted to the DNO for final record
 
Responsibilities
• Management of Safety from the System
• Interface with DNO, application for outages and the installation of temporary power (Generation) for identified stakeholders as per programme
• Management of Safety from the System during outage periods
• Submission of final records
 
Requirements
• SSE Authorised SAP on 33/11kv Distribution System
• Excellent communication skills
• Previous experience working on major OHL projects
 
If this role sounds like something of interest and you would like to know more, please get in touch with our recruitment team or apply online

Apply today and receive contact within 24 hours!

In the news

  • Charity Golf Day

    The tusp charity for 2017 is Inspire Suffolk, who are hosting a Charity Golf Day at Hintlesham Golf Club. They

  • HS2 Phase 2 Announced

    The Government have published Phase 2 of the HS2 route, which outlines where the Government will look to build the

Case Studies

Join the mailing list: